  • Transformer Substation of TransnetBW located in Schwörstadt

    This relatively small project located in Schwörstadt, is a new extension of an already existing transformer substation, which is run by TransnetBW. The building has one-storey and a standing seam roof. It’s dimensions are 30 x 9 meters including a nice storage room, a control centre and a distributer room. Moreover, two battery units secure the electricity supply in case of an emergency.

    The original transformer substation in Schwörstadt was built in 1972. The extension provides an electricity supply of 380 kV instead of 220 kV.

     

    Copyright: Wacker Objekt GmbH & Co. KG

    Parameters

    Start of Construction: Dezember 2019

    Construction Period: 10 months

    Floor Space: 231 m²